The Project of clean water distributing network including:
• More than 25,000 meters of the HDPE Pipes in various sizes
• Water Wells including submersible pumps, chlorine system equipment, Diesel generators and Building for it .
11/0.416 KV, 250 KVA electrical distribution transformers with the over head lines
• Concrete Water Reservoirs 100 m3 Capacity
• Electrofusion subscribing fittings
• Concrete Manholes (Gate and Air Valves)
• Pumps and booster stations