The Project of clean water distributing network including: • More than 25,000 meters of the HDPE Pipes in various sizes • Water Wells including submersible pumps, chlorine system equipment, Diesel generators and Building for it . 11/0.416 KV, 250 KVA electrical distribution transformers with the over head lines • Concrete Water Reservoirs 100 m3 Capacity • Electrofusion subscribing fittings • Concrete Manholes (Gate and Air Valves) • Pumps and booster stations



.jpeg)
